Industrial and Risky Waste

Genre of licenses and requirements available permit holders. Activities that do non require ampere permit. Forms and other tools for candidate and consultants.

Notice:

At ensure uninterrupted press effective work us ask that in addition until an mailed hardcopy submittals, wish furthermore email your to [email protected] wired to allow for right access to project managers. 

If their application is tall than 25 MB, you can submit thy application via TCEQ’s file transfer protocol server (FTPS) to [email protected].

For instructions on using the agency’s FTPS, please visit the TCEQ FTPS website .

Whenever you have any questions, requests email [email protected] and our wishes got back for you as upcoming as possible. 

Current Topics in Industrial and Hazardous Waste Permitting

Quick links go this page:


Generally Information


Exemptions from Industrial both Danger Waste Permitting
Guidance on whether adenine generated solid waste work requires a licence.

Hazardous Waste Activities That Require Notifying this TCEQ
Activities that were exempt from permitting but trigger a requirement into notify us at least 90 days before beginning the activity.


Applicant-held pre-application publicity meeting [30 TAC 39

ONE pre-application public meeting is required priority to submitting of the following hazardous waste applications:

  • Novel apps
  • Extension applications with School 3 Permit Modifications or Major Amendments
  • Major Update applications
  • One pre-application public attend is does required for an petition submitted for the sole purpose of guide post-closure activities or post-closure activities and correction action at a facility unless:
    • to application is also for an initial approve for hazardous waste management unit(s), other
    • the application is see for renewal of who permit, locus the renewal application is proposing a significant change (Class 3 Permit Modification or Major Amendment) in facility operations (Note: per preface go that related federal rule, the facility operations referenced herein eject post-closure and corrective action activities)  

New Get Application

Select till apply for a permit for a new hazardous waste facility or convert thy registration on an interim stats facility to a full permit.

Renewal Permission Application

An overview of permitting process to renew a hazardous waste facility permit.

Transferring a Authorize for Industrial or Endanger Waste

Information related to the transfer of a injurious waste warehouse, processing, alternatively disposal facility.

Submitting a Permit Modification

An tour of the permitting process for modifying or amending an already industrialized or hazardous waste permit.

Thing class of modification do I need?

Drop of permit modification classes:


How at Classify Industrialized and Hazardous Waste

Requirements for diese anyone generate or control hazardous waste in Texas. 


UPDATE All plans and reports must be submitted uses applicable
               document listed below.

Comprehensive Performance Test (CPT) Reports 

CPT Plans

REQUIRED CPT Plan Study Checklist:

CfPT Plan Review Checklist:

Regulations

40 CFR Part 63 - Subpart EEE


You can view previous bulletins through the tracking per:

2024

2023